Modular Sobering-Up Station in Jihlava
Modular Sobering-Up Station in the Premises of the Jihlava Hospital
Classification: | Healthcare projects | |
---|---|---|
Year of implementation: | 2019 | |
Architect / Studio: | Ing. arch. Jiří Pelikán | |
Country of implementation: | Czech Republic | |
Technical Specifications: |
Length of assembly: 3 Months Length of manufacture: 1 Month Number of modules: 10 Area: 260 m2 Product series: StandardLine |
|
Sales model: | Sale |
The new sobering-up station replaces the existing one which did not more comply with the new legislation in regards to the floor size of individual patient rooms, layout, and requirements for hygiene and equipment. The deputy director of the Jihlava Hospital, Mr. Alexandr Filip, commented on the facts: „The building proper brings with it many more improvements than the only the fulfilment of the legislative requirements. A notable upgrade of social and auxiliary facilities such as showers, toilets and changing rooms, both for the clients and for the working personnel, will be achieved.“ The construction order was placed by The Vysočina Region.
In the sobering-up station you can find air-conditioning and in-floor heating. The whole complex has a secondary roof and a secondary facade. The patient rooms have anti-vandal features. There are skylights in the roof. The wall fire resistance is DP1 – 45 min.
Reference location
Back to previous page