9 photos

Modular Extension of  Špačince


Thanks to our modular system, students were able to start school just three months after the first module of the extension was installed.

Classification:School Realisations / Elementary schools
Year of implementation:2024
Country of implementation:Slovakia
Technical Specifications: Length of assembly: 12 Weeks
Length of manufacture: 6 Weeks
Number of modules: 64
Area: 682 m2
Sales model:Sale

Each pavi­li­on con­sists of 32 modu­les with dimensi­ons of 6.73.13.5 m, with a clear inte­ri­or hei­ght of 3 meters. The pro­ject inclu­ded not only 6 clas­sro­oms, tea­cher offi­ces, and social faci­li­ties for stu­dents and sta­ff in each pavi­li­on but also the deli­ve­ry of exte­ri­or emer­gen­cy and inte­ri­or stai­r­ca­ses installed in the exis­ting building.

The ther­mal resistan­ce para­me­ter is ensu­red by clad­ding made of PUR panels, whi­le hea­ting sys­tems throu­ghout the buil­ding were designed accor­ding to the pro­ject and con­nec­ted to the exis­ting network. Com­pli­an­ce with current legislati­on is a given, and the buil­dings were addi­ti­o­nally equip­ped with cen­t­ral recu­per­ati­on sys­tems pla­ced on the roofs. The structu­res meet the stan­dards set by Slo­vak legislati­on, achie­ving ener­gy class A0.

Worth men­ti­o­ning is the clad­ding of the modu­lar parts of the buil­dings, made of design corru­ga­ted she­et metal.

The extensi­on of the ele­men­ta­ry scho­ol in Špa­čin­ce is unique not only in the pro­ject pre­pa­rati­on con­cer­ning modu­le installati­on but also in how quick­ly enti­re modu­lar flo­ors can be built on 50-year-old buildings.

Reference location

Back to previous page