Lodging Facility for Employees of FOSFA
A modular two-storey lodging facility consisting of 36 Standard Line series modules.
Classification: | Residential projects / Accommodation facilities | |
---|---|---|
Year of implementation: | 2019 | |
Client: | Fosfa a.s. | |
Country of implementation: | Czech Republic | |
Technical Specifications: |
Length of assembly: 2 weeks Length of manufacture: 1 week Number of modules: 36 Area: 756 m2 Product series: StandardLine |
|
Sales model: | Sale |
Advantages of modular construction, such as speed and easy building expansion, convinced FOSFA to build a residence for its employees using the modular concept. The two-storey building is assembled from 36 Standard Line modules and meets the DP1 fire resistance requirements. The equipment is of a higher utility standard, including wall-mounted toilets and a concealed water and waste distribution system. We delivered the lodging facility with a basic design and a sheet metal façade; in the course of time the building will later be fitted with plaster.
Reference location
Back to previous page